ADS-3SWSHD05-P3TLL-FFFFFF

"Psychedelic Swirl" Women's Basketball Sneakers

White / US5(EUR35)
$250.00
Sale price  $250.00 Regular price 
Skip to product information
ADS-3SWSHD05-P3TLL-FFFFFF

"Psychedelic Swirl" Women's Basketball Sneakers

$250.00
Sale price  $250.00 Regular price 
ColorWhite
Shoe size

A celebration of fearless imagination, the “Psychedelic Swirl” Women’s Curved Basketball Sneakers invite you into a universe where color refuses to stand still. Hypnotic waves of sapphire, emerald, violet, magenta, and electric yellow spiral across the silhouette, creating the illusion of constant movement. Inspired by Laurence Gartel’s groundbreaking Digital Art, every step becomes an immersive visual experience that blurs the line between fashion and fine Art.

Built for women who embrace bold self-expression, these high-top sneakers combine contemporary comfort with gallery-worthy design. The supportive curved basketball silhouette delivers stability and cushioning, while the vibrant Artwork transforms an everyday essential into a striking collectible. Whether paired with minimalist outfits or statement pieces, “Psychedelic Swirl” commands attention from every angle.

Features

  • Exclusive Laurence Gartel Artwork
  • Premium high-top basketball-inspired design
  • Cushioned sole for exceptional comfort and shock absorption
  • Durable rubber outsole with reliable traction
  • Designed for everyday wear, travel, and elevated streetwear
  • Museum-quality Wearable Art from The Gartel Collection

More than a sneaker, “Psychedelic Swirl” is a wearable invitation to celebrate creativity without limits—where movement, color, and imagination converge into a true collector’s piece.

 

  • The upper is made of leather and the sole is made of Rubber
  • Feature:Fashion Trend, Anti-Slippery, Hard-Wearing, Shock-Absorbant
  • Season: Autumn, Spring, Summer, Winter
  • Occasion: Outdoor, Sports
  • Gender: Women
  • Care Instruction: Spot clean only
  • Custom area is the upper, for custom areas please refer to yoycol mockup generator for details 
  • This product is made on demand. No minimums
  • Multiple shipping options available, and cost varies on time efficiency.

Size Guide

 

EUR Size US Size Insole Lengthinch Insole Lengthmm
35 5 8.9 225
36 6 9.1 231
37 7 9.4 238
38 7.5 9.6 244
39 8 9.9 251
40 9 10.2 259
41 10 10.5 266
42 11 10.6 270
43 12 10.9 278

 

Product measurements may vary by up to 3~5mm

EU representative: Europe Gateway International B.V., info@euegi.nl, Kraijenhoffstraat 137 A , Amsterdam, 1018RG, the Netherlands

You may also like